Maysan, Amara – Ali Muraj Suedj, the General Director of Maysan Oil Company has announced that they have drilled total 14 oil wells out of the total 20 oils in the field of Bazargan. All these wells are being drilled in the basis of the contract with the American company called Witherford which has completed the goal of drilling 20 wells in the same oil field.
The director has said in another statement that the crew and technicians of Witherford have achieved the drilling operation within record time and right now they are working on three more wells. This calculation leaves only three wells out of the total number of oils.
The same statement also added that the company has increased the total amount of production and it will also increase the economic condition of the country. The total number of oil wells has helped increasing the production capacity of 6900 bpd.
The director of the US Co. has stated that the Koscal Company was in a contract with the Chinese company named Cenok has finally accomplished repairing 101 oil wells in Abu Gharab oil field and the production capacity has increased up to 1700 bpd and same Chinese company has also repaired 17 wells of Fakka Oil Field presently.
Source [AIN]