| | |  |  | | Opening the water project Um Al-Hamam
In Karbala'a governorate, Um Al-Hamam water project was opened in Al-Husainia district. The engineer director of Karbala Water Department (Mr. Mohammed Al-Ta'aee) declared that this project is costing 500 thousand dollars. The project will supply water to more than 7 thousand people with 1 million gallons day which approximately equals to 200 square m/hour. The length of the net was more than 14 km of plastic pipes.
Iraq Business News Service: (Translated from Arabic)
| |
| |
| |